All Products
Contact Person :
Mike
Phone Number :
86-18790675017
Industrial Rail Electric Transfer Cart Factory Direct Sale
Contact me for free samples and coupons.
WhatsAPP:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xProduct Details
| Product Name | Battery-Power Transfer Cart | Usage | Heavy Duty Material Transportation |
|---|---|---|---|
| Load Capacity | 1-300ton | Special Function | Anti-Explosion,Heat-Resistant,Lifting,Customized |
| Material | Steel | Transport Package | The Whole Cart Will Be Packed By Tarp. |
| Specification | 2000*2000*500 | Trademark | BETTER |
| Origin | Xinxiang | HS Code | 84289090 |
| Production Capacity | 50 Sets/Month | ||
| Highlight | electric transfer cart factory,industrial cart transfer,industrial electric transfer cart |
||
Product Description
Factory Directly Sales Track Flatbed Electric Trolley Rail Transfer Cart for Sale
Introduction of Material Transfer Equipment
Our line of Material Transfer Equipment is designed to accommodate the needs of a wide range of industries such as steel, aluminum, automotive, stamping, heavy manufacturing and several others. These units are designed to operate on floor mounted rails and are used to transport heavy materials across crane bays or in areas not serviced by an overhead crane.
Application of Material Transfer Equipment
The trailing cable powered Heavy Duty Material Transfer Equipment is mainly applied in assembly line (ring production line, loop production line), metallurgy industry (steel ladle), warehouse transport, ship industry (maintenance, assemble, container transport), workpiece transport in workshop, lathe transport, steel factory (steel billet, steel plate, steel coil, steel pipe, section steel, steel structure), construction (bridge, simple building, concrete, concrete column), petroleum industry (oil pump, sucker rod and parts), energy (polycrystalline silicon, generator, windmill), chemical industry(electrolytic cell, retort etc), railway (rail maintenance, rail welding, train tractor).
Working Principle of Material Transfer Equipment
This Heavy Duty Material Transfer Equipment is powered by dragging cable. The power source 380-690v alternating if leaded into electrical control cabinet by cable, which controls the motor to make the cart start, stop, move forward and move backward. Hydraulic lifting system can be mounted on the car to meet the demand for car lifting. The Heavy Duty Rail Cart is suitable for running distance less than 20m, high using frequency.
Machining Of Material Transfer Equipment
Parameter of Material Transfer Equipment
| Model | BHX-2t | BHX-5t | BHX-10t | BHX-16t | BHX-20t | BHX-25t | BHX-30t | BHX-40t | BHX-50t | BHX-63t | BHX-80t | BHX-100t | BHX-150t | |
| Rated Load(t) | 2 | 5 | 10 | 16 | 20 | 25 | 30 | 40 | 50 | 63 | 80 | 100 | 150 | |
| Table Size (mm) | Length(L) | 2000 | 3500 | 3600 | 4000 | 4000 | 4500 | 4500 | 5000 | 5500 | 5600 | 6000 | 6500 | 10000 |
| Width(W) | 1500 | 2000 | 2000 | 2000 | 2200 | 2200 | 2200 | 2500 | 2500 | 2500 | 2600 | 2800 | 3000 | |
| Height(H) | 500 | 550 | 550 | 600 | 600 | 650 | 650 | 700 | 700 | 800 | 900 | 1000 | 1200 | |
| Wheel Base(mm) | 1200 | 2500 | 2600 | 2800 | 2800 | 3200 | 3200 | 3800 | 4200 | 4300 | 4700 | 4900 | 7000 | |
| Rail Inner Gauge(mm) | 1200 | 1435 | 1435 | 1435 | 1435 | 1435 | 1435 | 1435 | 1435 | 1435 | 1800 | 2000 | 2000 | |
| Wheel Diameter(mm) | 270 | 270 | 300 | 350 | 350 | 400 | 400 | 500 | 500 | 600 | 600 | 600 | 600 | |
| Wheel Quantity | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 8 | |
| Ground Clearance(mm) | 50 | 50 | 50 | 50 | 50 | 50 | 50 | 50 | 50 | 75 | 50 | 75 | 75 | |
| Running Speed(m/min) | 0-25 | 0-25 | 0-25 | 0-20 | 0-20 | 0-20 | 0-20 | 0-20 | 0-20 | 20 | 20 | 20 | 18 | |
| Motor Power(kw) | 0.8 | 0.8 | 1.5 | 2.2 | 2.5 | 3 | 4 | 5.5 | 5.5 | 7.5 | 7.5 | 11 | 15 | |
| Running Distance(m) | 25 | 25 | 25 | 25 | 30 | 30 | 50 | 50 | 50 | 50 | 50 | 50 | 50 | |
| Max Wheel Load(KN) | 14.4 | 25.8 | 42.6 | 64.5 | 77.7 | 94.5 | 110.4 | 142.8 | 174 | 221.4 | 278.4 | 343.8 | 265.2 | |
| Recommended Rail Model | P15 | P18 | P18 | P24 | P24 | P38 | P38 | P43 | P43 | P50 | P50 | QU100 | QU100 | |
Machining Of Material Transfer Equipment
CNC Cutting
Transport the steel plate from raw material warehouse to CNC cutting workshop for cutting. After the cutting, the workers will do some simple processing such as chip moving and setting out.
Preliminary Assembling
Put the cut steel plate together according to the design drawing
Welding
Weld the steel plate with automatic welding machine after the preliminary assembling
Post weld treatment
Test the welding section after the welding, polish and burring. Post weld treatment to eliminate welding stress
Spray Primer
Transport the structure part after processing to painting booth for spraying primer. The main component of the primer is zinc rich epoxy antirust paint. The primer is to two layers
Assembling
Assemble the structure parts after spraying primer with wheels, motors and gear box, etc.
Paint finish
Transport the assembled cart to painting booth, inspect the integrity of primer. After that paint the finish
Debugging
Debugging the cart after painting the finish with electric control system, after the debugging, the cart will test without load. And after the no load test, the cart will be tested with load. After the inspection, the cart will be transported to storage area.
Packaging and Shipping of Material Transfer Equipment
Transport the steel plate from raw material warehouse to CNC cutting workshop for cutting. After the cutting, the workers will do some simple processing such as chip moving and setting out.
Preliminary Assembling
Put the cut steel plate together according to the design drawing
Welding
Weld the steel plate with automatic welding machine after the preliminary assembling
Post weld treatment
Test the welding section after the welding, polish and burring. Post weld treatment to eliminate welding stress
Spray Primer
Transport the structure part after processing to painting booth for spraying primer. The main component of the primer is zinc rich epoxy antirust paint. The primer is to two layers
Assembling
Assemble the structure parts after spraying primer with wheels, motors and gear box, etc.
Paint finish
Transport the assembled cart to painting booth, inspect the integrity of primer. After that paint the finish
Debugging
Debugging the cart after painting the finish with electric control system, after the debugging, the cart will test without load. And after the no load test, the cart will be tested with load. After the inspection, the cart will be transported to storage area.
Packaging and Shipping of Material Transfer Equipment
*For length is less than 6m, the width is less than 2.2m. It will be transported by 20ft container. If the length is longer than 5.9m and less than 12m, it will be transported by 40ft container. If the quantity is 2 sets or 3 sets, they can be transported by full container. If the quantity is 1 set, it can be transported by LCL Container.
*If the length is less than 12m, the width is beyond 2.2m. It needs to be transported by flat rack (20 or 40 ft) . If the equipment is beyond above dimension, and quantity need to consider bulk cargo.
Factory


*If the length is less than 12m, the width is beyond 2.2m. It needs to be transported by flat rack (20 or 40 ft) . If the equipment is beyond above dimension, and quantity need to consider bulk cargo.
Factory
Certificates and Service

Recommended Products
