Professional Design Electric Trolley Rail Transfer Cart for Material Transportation in Industry
Contact me for free samples and coupons.
WhatsAPP:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
x| Product Name | Battery-Power Transfer Cart | Usage | Heavy Duty Material Transportation |
|---|---|---|---|
| Load Capacity | 1-300ton | Special Function | Anti-Explosion,Heat-Resistant,Lifting,Customized |
| Material | Steel | Transport Package | The Whole Cart Will Be Packed By Tarp. |
| Specification | 2000*2000*500 | Trademark | BETTER |
| Origin | Xinxiang | HS Code | 84289090 |
| Production Capacity | 50 Sets/Month | ||
| Highlight | electric trolley rail,electric rail trolley,industry rail trolley |
||
Introduction of Material Transfer Equipment
Application of Material Transfer Equipment
The material flow between workshops and warehouses
In the manufacturing plant, it undertakes the task of transporting semi-finished products and components from the raw material warehouse to the production workshop, or between different workshops.
The connection between production line processes
In assembly, processing and other assembly lines, be responsible for precisely transporting workpieces from one station to the next.
In-plant transportation of heavy machinery and components
In heavy equipment manufacturing and metallurgical enterprises, it is used for transporting large equipment components, steel coils, molds and other heavy loads.
Transportation in special industrial environments
Customizable design is available to adapt to special working conditions such as high temperature (such as in foundry workshops), high dust (such as in building materials factories), or explosion-proof (such as in chemical areas).
Working Principle of Material Transfer Equipment
This Heavy Duty Material Transfer Equipment is powered by dragging cable. The power source 380-690v alternating if leaded into electrical control cabinet by cable, which controls the motor to make the cart start, stop, move forward and move backward. Hydraulic lifting system can be mounted on the car to meet the demand for car lifting. The Heavy Duty Rail Cart is suitable for running distance less than 20m, high using frequency.Parameter of Material Transfer Equipment
| Model | BTL-2t | BTL-5t | BTL-10t | BTL-16t | BTL-20t | BTL-25t | BTL-30t | BTL-40t | BTL-50t | BTL-63t | BTL-80t | BTL-100t | BTL-150t | |
| Rated Load(t) | 2 | 5 | 10 | 16 | 20 | 25 | 30 | 40 | 50 | 63 | 80 | 100 | 150 | |
| Table Size (mm) | Length(L) | 2000 | 3500 | 3600 | 4000 | 4000 | 4500 | 4500 | 5000 | 5500 | 5600 | 6000 | 6500 | 10000 |
| Width(W) | 1500 | 2000 | 2000 | 2000 | 2200 | 2200 | 2200 | 2500 | 2500 | 2500 | 2600 | 2800 | 3000 | |
| Height(H) | 500 | 550 | 550 | 600 | 600 | 650 | 650 | 700 | 700 | 800 | 900 | 1000 | 1200 | |
| Wheel Base(mm) | 1200 | 2500 | 2600 | 2800 | 2800 | 3200 | 3200 | 3800 | 4200 | 4300 | 4700 | 4900 | 7000 | |
| Rail Inner Gauge(mm) | 1200 | 1435 | 1435 | 1435 | 1435 | 1435 | 1435 | 1435 | 1435 | 1435 | 1800 | 2000 | 2000 | |
| Wheel Diameter(mm) | 270 | 270 | 300 | 350 | 350 | 400 | 400 | 500 | 500 | 600 | 600 | 600 | 600 | |
| Wheel Quantity | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 8 | |
| Ground Clearance(mm) | 50 | 50 | 50 | 50 | 50 | 50 | 50 | 50 | 50 | 75 | 50 | 75 | 75 | |
| Running Speed(m/min) | 0-25 | 0-25 | 0-25 | 0-20 | 0-20 | 0-20 | 0-20 | 0-20 | 0-20 | 20 | 20 | 20 | 18 | |
| Motor Power(kw) | 0.8 | 0.8 | 1.5 | 2.2 | 2.5 | 3 | 4 | 5.5 | 5.5 | 7.5 | 7.5 | 11 | 15 | |
| Running Distance(m) | 25 | 25 | 25 | 25 | 30 | 30 | 50 | 50 | 50 | 50 | 50 | 50 | 50 | |
| Max Wheel Load(KN) | 14.4 | 25.8 | 42.6 | 64.5 | 77.7 | 94.5 | 110.4 | 142.8 | 174 | 221.4 | 278.4 | 343.8 | 265.2 | |
| Recommended Rail Model | P15 | P18 | P18 | P24 | P24 | P38 | P38 | P43 | P43 | P50 | P50 | QU100 | QU100 | |
Machining Of Material Transfer Equipment
CNC Cutting
Transport the steel plate from raw material warehouse to CNC cutting workshop for cutting. After the cutting, the workers will do some simple processing such as chip moving and setting out.
Preliminary Assembling
Put the cut steel plate together according to the design drawing
Welding
Weld the steel plate with automatic welding machine after the preliminary assembling
Post weld treatment
Test the welding section after the welding, polish and burring. Post weld treatment to eliminate welding stress
Spray Primer
Transport the structure part after processing to painting booth for spraying primer. The main component of the primer is zinc rich epoxy antirust paint. The primer is to two layers
Assembling
Assemble the structure parts after spraying primer with wheels, motors and gear box, etc.
Paint finish
Transport the assembled cart to painting booth, inspect the integrity of primer. After that paint the finish
Debugging
Debugging the cart after painting the finish with electric control system, after the debugging, the cart will test without load. And after the no load test, the cart will be tested with load. After the inspection, the cart will be transported to storage area.
Packaging and Shipping of Material Transfer Equipment
*For length is less than 6m, the width is less than 2.2m. It will be transported by 20ft container. If the length is longer than 5.9m and less than 12m, it will be transported by 40ft container. If the quantity is 2 sets or 3 sets, they can be transported by full container. If the quantity is 1 set, it can be transported by LCL Container.
*If the length is less than 12m, the width is beyond 2.2m. It needs to be transported by flat rack (20 or 40 ft) . If the equipment is beyond above dimension, and quantity need to consider bulk cargo.
Factory
